personnel hoisting platforms must be designed by

1 A qualified person familiar with structural design must design the personnel platform and attachmentsuspension system used for hoisting personnel. Do not apply to cantilever type personnel hoists.


Crane And Derrick Safety Ii Hoisting Personnel Oshacademy Free Online Training

The hoist platform enclosure must include the required gates for loading and unloading.

. Ladders scaffolds stairways aerial lifts and personnel hoists must be considered before using a personnel platform. 5 All welding of the personnel platform and its components must be performed by a certified welder familiar with the weld grades types and material specified in the platform design. A The use of equipment to hoist employees is prohibited except where the employer demonstrates that the erection use and dismantling of conventional means of reaching the work area such as a personnel hoist ladder stairway aerial lift elevating work platform or scaffold would be more hazardous or is not possible because of the projects structural design or.

A qualified person familiar with structural design must design the personnel platform and attachmentsuspension system used for hoisting personnel. The use of a crane suspended personnel platform manbasket is prohibited unless there is no safer practical conventional means of access to an elevated work area. A qualified person familiar with structural design must design the personnel platform and attachmentsuspension system used for hoisting personnel.

Support platform weight and at least five times the maximum intended load. Crane Suspended Personnel Platform MANBASKET Permit. The required design factor is achieved by taking the current safety factor of 35 and applying the 50 derating of the crane capacity.

Only personnel instructed in the requirements of the standard and the task to be performed - along with their tools equipment and materials needed for the job - are allowed on the platform. A qualified engineer or another competent specialist qualified in structural design Your Answer 9. Must show the boom length or the load radius must be measure d.

C You must engage load and boom hoist drum brakes swing brakes and locking devices such as pawls or dogs when the occupied personnel platform is in a stationary working position. 6 The personnel platform must be equipped with a guardrail system which meets the requirements of subpart M of this part and must be enclosed at least from the toeboard to mid-rail with either. Both cranes must hoist and lower the loads at the same speed.

C The personnel platform itself except the guardrail system. Only personnel instructed in the requirements of the standard and the task to be performed - along with their tools equipment and materials needed for the job - are allowed on. A 6-foot high enclosure shall be provided on the unused sides of the hoist tower at ground level.

A The personnel platform and suspension system must be designed by a qualified engineer or a qualified person competent in structural design. Ladders scaffolds stairways aerial lifts and personnel hoists must be considered before using a crane to hoist personnel. Personnel platform design is specified The platform may be designed by a qualified engineer or by a nonengineer with stru c t u r al design e x p e ri e n c e.

19261431e2 The system used to connect the personnel platform to the equipment must allow the platform to remain within 10 degrees of level regardless of boom angle. 1 Personnel platforms andor their suspension systems must be designed constructed and tested according to ASME B3023-2005 Personnel Lifting Systems. A qualified engineer or another competent specialist qualified in structural design True or False.

When hoisting a personnel platform using 19x19 rotation. If these options are considered more hazardous or not possible because of design or worksite conditions the hoisting of personnel from a crane is permitted using the following procedural guidelines. All material hoist towers shall be designed by a licensed professional engineer.

Crane Suspended Personnel Platforms The use of a crane suspended personnel platform is prohibited unless there is no safer practical conventional means of access to an elevated work area. Personnel hoisting platforms must be designed by. 19261431 Hoisting personnel.

B When a hoist tower is not enclosed the hoist platform or car must be totally enclosed caged on all sides for the full height between the floor and the overhead protective covering with 34 inch mesh of No. 2 The system used to connect the personnel platform to the equipment must allow the platform to remain within 10 degrees of level regardless of boom angle. The requirements of this section are supplemental to the other requirements in this subpart and apply when one or more employees are hoisted.

A qualified engineer or a qualified person competent in structural design must design platforms used for lifting personnel to do the following. Personnel hoisting platforms must be designed by. B The suspension system must be designed to minimize tipping of the platform due to movement of employees occupying the platform.

Welding must be per-f o r med by a welder who need not be c e r tified but must be familiar with. The safety design factor for a personnel platform structure and the rigging must from FABIO 112334 at The Times College Lahore. Personnel Platforms What are the design specifications for personnel platforms.

19261431e2 The system used to connect the personnel platform to the equipment must allow the platform to remain within 10 degrees of level regardless of boom angle. Personnel hoisting must not be conducted until the PIC determines that the platform. The design and manufacturers specifications must be made by a registered professional engineer.

Document the results of the Proof Test in Section 5 of UCN-23253 Suspended Personnel Platform Safety Checklist. Gauge wire or equivalent. The personnel platform must be equipped with a guardrail system which meets OSHA criteria and must be enclosed at least from the toeboard to mid-rail with either solid construction material or.

Ladders scaffolds stairways aerial lifts and personnel hoists must be considered before using a personnel platform. The hoist platform enclosure shall include the required gates for loading and unloading. After proof testing the PIC must inspect the platform and rigging to determine if the test has been passed.

6 Personnel platforms - Design criteria. Minimize tipping caused by personnel. All welding of the personnel platform and its components must be performed by a certified welder familiar with the weld grades types and material specified in the platform design.


Crane And Derrick Safety Ii Hoisting Personnel Oshacademy Free Online Training


Crane Suspended Personnel Platform Manbasket Permit


Crane And Derrick Safety Ii Hoisting Personnel Oshacademy Free Online Training


2


Personnel Baskets Wrs Fall Protection Systems And Osha Training Webb Rite Safety


2


Crane And Derrick Safety Ii Hoisting Personnel Oshacademy Free Online Training


Crane Suspended Man Basket Osha Lifting Technologies